• Supply and installation of PN 16, 160 mm HDPE pipe from the PAW chamber to the storage tanks inside the Haima MOD camp
  • Construction of Electromagnetic Flow meter chamber including supply and installation of all the fittings (Siemens flow meter- MAG 5100, Cla-val Flow Control valve, Gate valves, strainers etc)
  • Supply and installation of Level transmitter inside the storage tank (Siemens- Probe LU240)
  • All the electrical scope including panel works requiredfor the instrumentation works.
  • Supply and installation of PLC panel (Siemens –Simatic S7-1200)
  • Testing and Commissioning of the entire system
  • PLC programming and integration with SCADA server inside MOD compound.
  • Asphalt road cutting/Reinstatement, Interlock/tile removal and reinstatement