• Supply, Installation and commissioning of Sewage Lifting Pumps (1 Duty+ 1 Stand by, Flygt –Sweden – NP3069.160SH270)
  • Establishing the Electrical connection as per the MOD-MEDC standard
  • Construction of Sewage lifting station with a capacity of 50 Cub Meter
  • Construction of water and irrigation line
  • Construction of Sewage gravity line as per Haya standard
  • Construction of isolation valve chamber
  • Supply and installation of electromagnetic flowmeter (Siemens-MAG 8000)
  • Testing, commissioning and configuration to the existing SCADA