- Supply installation and commissioning of Electromagnetic Flow meter (Siemens MAG 8000) with Data Logger (Soffrel)
- Construction of Flow Meter Chamber including installation of EM flow meter (Siemens MAG 8000) Strainer, Pressure Sustaining Valve,Gate Valves etc
- Construction of Customer connection chamber
- Shut down work including interconnection from OD 550 mm HDPE pressure line
- Construction of irrigation line to the storage tank inside sports complex
- Establish Float Valve controlling system for the automatic water filling
- Testing commissioning and configuration to the existing Haya server located at control center