- Construction of water main line up to the size of 225mm HDPE pipe of 21,000 M
- Establishing house connection of 130 Nos including approximate 5,000 meters of service line construction
- Topographical Survey including GIS drawing, Shop drawing and As built drawing etc
- Construction of 21 Nos Fire Hydrants as per Nama Standard
- Construction of 36 Nos of Valve chambers in buried condition
- Construction of 11 Nos of Air valves with chamber
- Construction of 4 Nos washout chamber
- 100Meters of future road crossing and all related jobs
- 3 Major Shutdown Interconnection work at PAW (Diam) main Line