• Construction of water main line up to the size of 180mm HDPE pipe of 600
  • Construction of water main line up to the size of 110mm HDPE pipe of 1,200 M
  • Establishing house connection of 30 Nos including approximate 400 meters of service line construction
  • Topographical Survey including GIS drawing, Shop drawing and As built drawing etc
  • Construction of 3 Nos Fire Hydrants as per Nama Standard
  • Construction of 3 Nos of Valve chambers in buried condition
  • Construction of 2 Nos of Air valves with chamber
  • Construction of 1 Nos washout chamber
  • 100 Meters of future road crossing and all related jobs
  • Shutdown Interconnection work at NWS (TFS) main Line