- Supply and installation of submersible bore well pump of 5.5 Kw capacity , installation at 145 meters depth inside the bore well with all the required fittings in the wellhead- 2 years warranty
- Establishing the electrical connection from the nearest SMBD (substation), supply and installation of
- 4 core 10 Sqmm2of electrical cables of quantity 450 meters and connection as per MEDC standard
- Supply and installation of HDPE pipes to the shooting range at Halban Camp, RoyalGuard of Oman
- All the Electrical/Instrumentation connection works in the Pump control panel with float control
- Construction of Air valve/ Isolation and Inspection chambers
- Asphalt cutting and reinstatement as per Muscat Municipality standard
- Wadi Protection works-40meters