- Laying of 110mm HDPE Pipes- 3150 meter, including excavation in excavation in all types of soil, trench of suitable width including back-filling with well graded soil materials, compacting, cart away surplus excavated materials.Providing the bedding and surrounding materials in trench, laying of detectable warning tape
- Removal of old pipes, fittings, house connection fittings & transferring scrap to near by Client warehouse
- House Connections till meter as per Nama standard - 210 nos
- Asphalt Road crossing and Reinstatement of Asphalt Pipes- 370 meter
- Reinstatement of Interlock, Tiles, Concrete.- 2980 meter
- Re-connection to the existing Gate Valve & Air Valve- 10 nos
- Re-connection to the existing Fire Hydrant - 10 nos
- HDD work for Newly constructed Asphalt Road - 5 nos